All Results for "2830" (1.830)

Select a category below to see filtering options and narrow down your search.
Sort Order:
Categories sorted by Result Count.
Sort Order:
Categories sorted by Result Count.
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Lumileds White LEDs Warm-white 2835 S 3V 80 CRI Full Distribution Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835 S 3V 80 CRI 3 SDCM (D) + opposite bin matching kit (E+G, F+H) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835 S 3V 80 CRI Full Distribution where =70% 3 SDCM (D) Non-Stocked Lead-Time 5 Weeks
Min.: 480.000
Mult.: 16.000
: 16.000

Lumileds White LEDs Warm-white 2835 S 3V 90 CRI 3 SDCM (D) + opposite bin matching kit (E+G, F+H) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835 S 3V 90 CRI 3 SDCM (D) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Samtec Board to Board & Mezzanine Connectors Flexible Micro Board Stacking Header Non-Stocked Lead-Time 2 Weeks
Min.: 275
Mult.: 275
: 275
Silex Technology Multiprotocol Modules 1x1 Wi-Fi+BLE radio /baseband SDIO Card Non-Stocked Lead-Time 30 Weeks
Min.: 100
Mult.: 100

Epson Timing Standard Clock Oscillators SG-8018CE 7.372830M-TJHSA0: MHZ OSC 1.8V 3.3V +/-50PPM -40 105C ST 1K TR Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1
: 1.000
Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
: 4.000

Lumileds White LEDs Warm-white 2835HE 3V 90 CRI 3 SDCM (P,Q,X,Y) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835HE 3V 90 CRI Full Distribution where =70% 3 SDCM (D) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835 S 3V 90 CRI Full Distribution where =70% 3 SDCM (D) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835 S 3V 90 CRI Full Distribution Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs White 3000 K 70-CRI, LUXEON 2835 Line Non-Stocked Lead-Time 5 Weeks
Min.: 40.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835 S 3V 90 CRI 3 SDCM (D) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835 S 3V 90 CRI 3 SDCM (D) Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs Warm-white 2835HE 3V 70 CRI Full Distribution Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Samtec Board to Board & Mezzanine Connectors Flexible Micro Board Stacking Header Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1
Astrodyne TDI Power Line Filters Bookshelf 3-Phase Delta Single Stage Power Line Filter Non-Stocked Lead-Time 10 Weeks
Min.: 10
Mult.: 10

Astrodyne TDI Power Line Filters Bookshelf 3-Phase Delta Single Stage Power Line Filter Non-Stocked Lead-Time 10 Weeks
Min.: 10
Mult.: 10

Astrodyne TDI Power Line Filters Bookshelf 3-Phase Delta Single Stage Power Line Filter Non-Stocked Lead-Time 10 Weeks
Min.: 10
Mult.: 10

Astrodyne TDI Power Line Filters 480V, 3-Phase WYE Dual Stage Power Line Filter
Non-Stocked Lead-Time 10 Weeks
Min.: 3
Mult.: 3

Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000

Lumileds White LEDs White 3000 K 90-CRI, LUXEON 2835 Line Non-Stocked Lead-Time 5 Weeks
Min.: 120.000
Mult.: 4.000
: 4.000